Co-living Apartments, Roma
Dicembre 18, 2018
Fitness Center, Torino
Dicembre 18, 2018

Secondary School Construction Project


Firenze


The client requested a final project stage representation for the steel rebars and concrete structures of the entire school complex, including the gym, that would be integrated into the federated model. The team implemented the structural components starting from the foundation then continuing with the slabs, columns, beams, stairs and the roof of both edifices. Reinforcing schemes are modeled in high precision, with rebars having diameters that varied from 6 mm to 30 mm, for a total of 9 different types. Particular attention was also paid in the metallic staircase located in the internal court of the school that was modeled in a very specific geometry useful for construction purposes.

#BuildingInformationModeling #StructuralModeling #StructuralBIM #BIMStructureModeling

2019

 
 
interior4-button-footer