Part of the production plant of a dynamic Italian industrial Group, the Logistics Facility, is a 2.000 sqm fully automated warehouse. Here products are collected as soon as the production phase is over. This makes the product preparation phase particularly simple for shipment out of the compartment, since the incoming and outgoing storage is completely automatic.
To optimize the design and construction process, BrainsDigital established and managed a seamless digital workflow, encompassing conception, design, analysis, engineering and off-site fabrication of the steel structures.
#VirtualDesign&Construction #BuildingInformationModeling #OffSiteFabrication #BIMStructureModeling #FabricationModels #ShopDrawings #ProjectManagement